In Los Eucaliptos we had a few projects to implement this summer, all working towards the common goal of providing potable water. The biggest task was the construction of the well house. The well house contains all of the electrical controls necessary to operate the system. It was completed with the considerable help of Celso, the community’s president and a mason, and other community members. There was existing galvanized steel pipe that we removed and rethreaded to go into the well house, through a pipe tree containing valves, and out by the well. To avoid possible contamination, we decided to install lot connections for each house in the community. This allows each community member to connect water to their house however they please without risking contamination to the system. The last project we started while in country was the fencing around the well house. After placing the posts and gate locations, the community knew how to finish the remaining work.

Following the completion of our implementation projects, we inspected systems we had installed in previous years. We found that the houses suffering from up seepage had not experienced any more following the installation of a French Drain last summer. The distribution piping was in good condition and only required minimal repairs following saddle valve installations. Last summer, we had to patch leaks on the water storage tank. This year we didn’t find any issues with the tank. 

We placed a big emphasis on educating the community on all aspects of their system to ensure sustainability. The community had a heavy hand in the construction of the well house, which provides them with an excellent knowledge of how to maintain it. The community has an elected water committee to manage the system. The community’s electricity company, SETAR, installed electrical connections necessary to operate the well pump. With the implementation of these projects, as soon as the well pump is installed by COFADENA, the well drilling company, water will be flowing in Los Eucaliptos. The community has the necessary materials and knowledge of how to shock chlorinate their system after it is completed. This will achieve the goal of our work in Los Eucaliptos and will provide the community with a potable water system and the knowledge of how to maintain it.

Leave a Reply

Your email address will not be published. Required fields are marked *

 

Choose Design Team
  • Student Design Teams
  • Missouri S&T Racing
  • Miner Aviation
  • Baja SAE
  • Missouri S&T Concrete Canoe
  • Engineers Without Borders
  • Formula SAE Electric
  • Human Powered Vehicle Team
  • Missouri S&T iGEM
  • Missouri S&T Underwater Robotics
  • Missouri S&T Solar Car Team
  • Missouri S&T Solar House Design Team
  • Steel Bridge Design Team
  • Mars Rover Design Team
  • Multirotor Robot Design Team
  • Missouri S&T Chem E Car
  • Missouri S&T Rocket Design Team
  • Miner Motorcycle Design Team
  • Battlebots
  • Nuclear Science Design Team
  • testsite